The Problem

    A City in Crisis

    Vancouver's housing market is failing the people who need it most—and the way we build is making it worse.

    Too few homes. Too much demolition every time land changes hands.

    We can't build our way out by tearing everything down.

    By the Numbers

    The crisis isn't abstract—and neither is the fix. These are the realities driving relocatable, factory-built housing. Every figure links to its primary source.

    3.5M

    Homes Canada still needs

    Additional units required by 2030 just to restore affordability

    CMHC, Housing Shortages in Canada (2023)

    21,500+

    Households on the waitlist

    Waiting for affordable housing across Metro Vancouver

    Metro Vancouver Housing Data Book, 2025

    $1,970

    Average monthly rent

    Metro Vancouver purpose-built average, up 2.0% year over year—new leases cost far more

    CMHC Rental Market Survey, October 2025

    30,000

    Homes demolished since 2012

    Torn down across Metro Vancouver in just over a decade—roughly 2,500 a year

    Light House / Unbuilders demolition report, 2025

    57%

    Of residential land

    Zoned single-family—much of it housing just one or two people per lot

    City of Vancouver, Housing Characteristics Fact Sheet

    50% faster

    Factory-built homes

    Modern off-site construction delivers homes up to twice as fast as site-built

    RBC, A New Blueprint: Modern Methods of Construction (2025)

    40% cheaper

    Cost to build

    Off-site methods can cut delivery costs versus traditional construction

    RBC, A New Blueprint: Modern Methods of Construction (2025)

    7.5%

    Of Canada's build market

    Share currently using modern off-site methods—the headroom is enormous

    RBC, A New Blueprint: Modern Methods of Construction (2025)

    The Challenge

    Four Forces Colliding

    Vancouver's housing challenge isn't just about supply — it's about how land transitions and what we lose in the process.

    GroundShare Housing

    Four forces converge on every Vancouver lot at once.

    Densification Is Coming

    Vancouver's long-term plan transforms single-family neighbourhoods into multi-family zones. This is necessary—but it takes decades to unfold, and in the meantime, land sits idle.

    Demolition Is the Default

    When lots redevelop, existing structures are torn down—materials wasted, embodied energy lost, housing destroyed. The cycle repeats with every transition.

    Idle Land Produces Nothing

    Across the city, backyards, transitional lots, and sites awaiting development sit empty. No housing, no income, no community benefit—just potential waiting.

    Owners Hesitate to Build

    A landowner planning to redevelop won't build a carriage house first—it will need to come down when the time comes. Permanent structures lock in decisions no one is ready to make, so the land sits empty instead of housing anyone.

    GroundShare resolves all four — relocatable homes that activate idle land today and step aside when densification arrives. See how it works →

    The Cost of Doing Nothing

    The current model treats housing as disposable. Every year the status quo continues, losses compound.

    • Build, occupy, demolish. That's the cycle—repeated every time land use changes.
    • Land sits empty. Owners avoid adding homes because permanent structures complicate future plans.

    What We Lose Every Cycle

    • Housing lost

      Every demolition removes homes from an already strained market.

    • Materials wasted

      Construction debris from teardowns fills landfills instead of serving communities.

    • Communities disrupted

      Residents are displaced during multi-year redevelopment timelines.

    • Opportunity squandered

      Idle land could be producing below-market rental housing right now.

    There's a Better Way

    What if homes didn't have to be demolished when land use changes? What if idle land could produce housing today—without locking out future development?